The bifold doors are in - just waiting on the front door and the windows above it now - they should be in by the end of next week.
The roof is finished at the front - and the solar panels have been installed on the back. The roof on the back shouldn't take too much longer.
Dave has sanded and varnished the lintel above the fireplace in the lounge.
The backplates for the toilets are now in situ in the upstairs bathrooms, along with the shower trays.
And perhaps, most exciting, we have plasterboard and some plastering completed in some of the rooms upstairs. It makes the size of the rooms much more apparent.
Below is Aidan's room
The fifth bedroom
And the annex/boys den
Tomorrow, we are heading into Leicester to look at blinds and curtains. Starting to become even more of a reality!